Sunday, March 27, 2005

27 March 2005

Ride up Graham Hill to Felton.
Ride up East Zayante to Summit Road.
Ride west on Summit, Bear Creek, and Skyline.
Ride down Highway 9 in the rain back to Santa Cruz.

About 59 miles in about 4:55.

Sunday, March 20, 2005

20 March 2005

Ride up Branciforte and Glen Canyon to Scotts Valley.
Ride up Bean Creek Road and Mountain Charlie Road to Summit Road.
Ride along Summit Road to Soquel-San Jose.
Ride down Soquel-San Jose to Laurel Glen.
Ride up Laurel Glen and down Mountain View.
Ride along Branciforte back to Santa Cruz.

About 42 miles in about 3:20.

Friday, March 18, 2005

13 March 2005

Brief summary:
Ride up Highway 9 from Santa Cruz to Felton.
Ride up Felton-Empire, down Ice Cream Grade and Pine Flat to Bonny Doon.
Ride on Smith Grade to Empire Grade.
Ride down Empire Grade back to Santa Cruz.