Saturday, July 27, 2013

27 July 2013

Santa Cruz Mountains Challenge Workers Ride

I started early and it was foggy with drizzle in the air. I got to the start a little late, but got signed in, then started up Bean Creek, Glenwood, Mountain Charlie, and Riva Ridge. Then, I took Summit, Bear Creek, and Skyline. At Hwy 9, I turned left and headed down, then took Hwy 236 through Big Basin. I started up Jamison Creek at 11:15 and got to the top at 11:41 for a time of about 25:42. Since the ride was supported, I stopped for about 35 minutes on Empire Grade for food and drink, then headed down Empire Grade and back home.

0 comments: